Before Cronovirus struck, I was in the process of sourcing some bits for the Sidesteps :
Hardware :
Cleaned up some of the mounting holes :
And proceeded to locate them :
Drilled & bolted on the back :
Test fitted the front :
Didn't have to drill any holes, but the splash guard needs to be repaired / replaced, so made a template :
And test fitted it :
Then marked it out on some signage sheet I found :
& Cut out with jig saw :
That was far as I got when things shut down ... :/
( was not able to travel to site where ute is located )
Hope to pick up where I left it - when things go back to 'normal' ...